Current Project
|
|
|
|
|
Mansuri Project
|
|
|
Phase 1 includes the following physical activities:
3D seismic survey, Full field studies including reservoir and techno-economical study, General studies and surveys: geotechnical, HSE and sand control, Work over of 12 existing wells, Drilling of one new well,Rehabilitation and up-grading of existing production unit.(to 100 MBOPD), Construction of new pipeline (for 150 MBOPD) from Mansuri production unit to Ahwaz Booster Station. (ABS), Construction of new process plant and de-salter unit (with capacity of 75 MBOPD and 20% water-cut).
[
More...
]
|
|
Darquain Field Development Project
|
|
First stage of Development :
Drilling and completion of 3 appraisal wells, 5 development wells and a gas injection well and installation of gas injection system (including a dehydration column and a high pressure compression train) and a 17 Km pipeline to transfer stabilized oil to the existing Ahwaz–Abadan pipeline.
Second stage of Development:
Drilling and completion of 15 development and 3 gas injection wells and a water disposal well, construction and installation of additional production and injection facilities.
[
More...
]
|
|
Development of Salman Oil and Gas Fields
|
|
Drilling of 9 production wells in addition to establishing 2 well-head platforms and one residential platform, installing a gas-sweetening plant at Assaluyeh, and transporting gas output of the field to Assaluyeh gas plant via a 30-inch, 240 KM pipeline, and establishing other facilities to achieve the objectives of the development operation.
[
More...
]
|
|
Development of Fields With Heavy and Extra Heavy Crude Oil
|
|
3 dimentional seismic operations and drilling of 7 exploration wells are foreseen for Kooh-Mond field.
Three dimensional seismic operations, drilling of 7 wells, installation of above-ground facilities for injection and storage of chemicals, and electricity supply for test production are envisaged for zagheh field.
Preliminary studies, 3-dimensional seismic operations for a 300 square km in the sea bed, and the study on the design of field development to evaluate/estimate recoverable reserves and final production of heavy crude oil are foreseen.
[
More...
]
|
|
Development of Balal Oil Field
|
|
Drilling of 5 production wells and 5 injection wells to inject 50,000 barrels water per day in order to maintain reservoir pressure to facilitate the increased output.
Artificial recovery techniques with in-well-installed pumps (ESP) will be used in this project. Major equipment includes ;2 main production/residential platforms, flare platform and well-head platform system of transferring oil to Lavan Island, water-injection system, generators and fuel- supply systems.
[
More...
]
|
|
Development of Dorood Oil Field
|
|
The implementation work consists of drilling of 29 new wells which include 15 production wells, 12 water injection wells and 2 gas injection wells. Injection of water and gas to reservoir is planned to achieve the maximum possible incremental oil production.
Major equipment and facilities include:
Gas treatment unit, gas dehydration unit, water injection unit, gas injection unit, turbo generators, installation of an offshore platform and pipe lines onshore and offshore between clusters and new plant.
[
More...
]
|
|
Development of Forouzan and Esfandiar Oil Fields
|
|
The implementation work consists of drilling and completion of additional production wells on platforms F2 (7 new and 7 re-entry wells), F3 (6 new wells) and F8 ( 3 new wells), drilling one appraisal well on Esfandiar structure and also, evaluationg the existing facilities in both fields and installing necessary facilities with a view to increasing produced gas output.
[
More...
]
|
|
Gathering Associated Gases from Southern Oil Fields
|
|
The implementation work includes installation of 8 gas-compressor stations plus 8 gas-dehydration next to the xcisting production units and setting up of a gas sweetening plant to be located 1 km from the gas liquefaction units 700 and 800. Other works consist of construction of 278 km of 6-18 inch pipeline, installing 85 rows of pressurizing compressors in the station and the reconstruction and re-commissioning of Mahshar gas refinery.
[
More...
]
|
|
|
|
|
|
 |
|