Mansuri Project

Project Goals
Mansuri oil-field development project is to increase the daily rate of production from Asmari formation from 65 MBOPD in 2 phases.

Phase 1: Increasing daily oil production rate to 100 MBOPD with collecting additional field data and conducting studies to property evaluation of the field to ultimately achieve the plateau rate of 150 MBOPD.
Phase 2: Increasing daily oil production rate to 150 MBOPD, after investigation
Executive Activities
Phase 1 includes the following physical activities:

3D seismic survey, Full field studies including reservoir and techno-economical study, General studies and surveys: geotechnical, HSE and sand control, Work over of 12 existing wells, Drilling of one new well,Rehabilitation and up-grading of existing production unit.(to 100 MBOPD), Construction of new pipeline (for 150 MBOPD) from Mansuri production unit to Ahwaz Booster Station. (ABS), Construction of new process plant and de-salter unit (with capacity of 75 MBOPD and 20% water-cut).
Location
Mansuri Oil Field is located about 60km North of Persian Gulf and approximately 50km Southeast of Ahwaz along the shore area of Southwest Iran
Basic Contractor
Contract type for Managment Contractor (MC) is Cost Plus Fee. Construction of Projetion will be EPC or PC based on their nature.
Project Schedule
Phase1: Started on April 2004, is to be done in a 2 years period
Phase2: Is to be decided by NIOC board of directed base on the result from phase-1 reservor tech-economical studies.
 

.


History


Mansuri oil field was discovered in 1962/63 and subsequent drilling has confirmed for drilling of two resrvoirs (Asmari and Bangestan).


It was put on production in 1974. A total of 56 wells have been drilled on the field so far. The reservoirs are currently producing approximately 125 MBOPD of which the Asmari reservoir is producing approximately 75 MBOPD from 13 wells and rest is produced form Bangestan reservoir.


During 2001/2002 under the supervision of Petrolerm Development and Engineering co. (PEDEC), a feasibility study for the development of Mansuri Asmari reservoir was carried out by Paravar Co and its join venture GCA (Gaffeny Cline Associates). This study resulted in a project to increase the daily production rate from Asmari formation to 100 MBOPD.


Technical Properties


The field structure is an elongated anticline covering an area 42*5.5km and Asmari formation has been divided to 8 zones. The first 3 zones plus a very small part of xone 4(4million) are recognized as oil bearing and the remaining zones are wet.


The estimated Stock Tank Oil Initially in Place for Mansuri-Asmari reservoir is in excess 3315 million barrels.


It has potentiol recovery of 40% and the reservoir fluid is asiginificantly under saturated oil of 29 API gravity with a GOR of 450 SCF/STB.


Job Opportunities


Putting this project into operation will provide temporary job opportunities for 300 persons (50 persons as direct and 250 persons as indirect) and also permanent job for 130 persons (30 persons as direct and 100 persons as indirect).


Training and Technology Transfer


Contractors must spend one present of total investment (650000$) for training and technology transfer to Iranian stuff.


 



 